List your firm
Planning and regs

Bathroom zones explained: what electrics can go where

Zones 0, 1 and 2 measured out, the IP rating each needs, where lights, fans, towel rails and sockets can go, and which bathroom electrical work needs certifying in each UK nation.

Bathroom zones are the areas around a bath or shower where the wiring regulations limit which electrics can go and how well sealed they must be. Zone 0 is inside the bath or tray, zone 1 rises above it to 2.25 m, and zone 2 runs 0.6 m beyond that. We cover the measurements, the IP ratings, where fittings can go and when the work needs certifying.

What are bathroom zones?

Bathroom zones come from BS 7671, the wiring regulations electricians work to across the UK. They are measured from the bath or shower tray, not from the walls of the room, and Approved Document P describes the same space for England: up to 2.25 m above the floor and 0.6 m out from the edge of the bath or tray.

Bathroom zones at a glance
ZoneWhere it isMinimum IP ratingTypical fittings
Zone 0Inside the bath or shower trayIPX7, at 12 V maximumSealed low-voltage lights
Zone 1Above the bath or tray, to 2.25 m from the floorIPX4Shower lights, extractor fans
Zone 20.6 m out from zone 1, to 2.25 m highIPX4Wall lights, mirrors, towel rails, shaver sockets
Outside the zonesBeyond zone 2NoneCeiling lights, switches, sockets 2.5 m from the bath

Zone 0

Zone 0 is the inside of the bath or shower tray. Fittings there must be rated at least IPX7, which survives temporary immersion, and run at 12 V or less, so in practice only sealed bath or tray lighting goes in.

Zone 1

Zone 1 is the space directly above the bath or tray, up to 2.25 m from the floor. Fittings need at least IPX4, and a mains-voltage fitting there also needs a 30 mA RCD. Shower lights and extractor fans are the usual zone 1 fittings.

Zone 2

Zone 2 is a band 0.6 m wide around zone 1, to the same height, and needs IPX4 as a minimum. Wall lights, illuminated mirrors, heated towel rails and shaver sockets commonly sit here.

Outside the zones

Anything beyond zone 2 is outside the zones, often called zone 3. No minimum IP rating applies there unless water jets are used for cleaning, and a ceiling light that is not directly above the bath or shower is usually out here.

Walk-in showers with no tray

A wet room or walk-in shower has no tray edge, so the zone is measured from the fixed shower head. In England the special location then runs 1.2 m out from the shower head, still to 2.25 m high, which in a small wet room takes in most of the floor.

IP ratings for bathroom zones

An IP rating is a two-digit code for how well a fitting keeps out solids and water. The first digit, 0 to 6, covers dust and solid objects. The second covers water, and a higher number keeps out more. An X means the fitting was not rated for that, so IPX4 and IP44 give the same water protection.

IP codes you will see on bathroom fittings
RatingWater protectionMeets the minimum for
IPX4 or IP44Splashing from any directionZones 1 and 2
IPX5 or IP65Low-pressure water jetsZones 1 and 2 where jets are used for cleaning
IPX7 or IP67Temporary immersionZone 0, at 12 V maximum

IP44 is the minimum for zones 1 and 2. Many shower lights are sold at IP65, which adds protection against jets and dust, and that is the rating we would buy for a light directly over the shower head.

What electrics can go where in a bathroom

The zone sets the rating a fitting needs. Whether fitting it needs certifying depends on the nation, and the right-hand column is England's rule.

Common bathroom fittings: where they go and whether fitting them is notifiable in England
FittingWhere it can goNotifiable in England?
Ceiling lightAny zone, if rated for itNew point in a zone: yes. Straight swap: no
Extractor fanZone 1, zone 2 or outside the zonesInside a zone: yes. Outside, on an existing circuit: no
Illuminated mirrorUsually zone 2New point in zone 2: yes
Electric towel railZone 2 or outside the zonesIn zone 2: yes
Shaver socketWithin 2.5 m of the bath only as a shaver supply unitNew point in a zone: yes
Standard 13 A socket2.5 m or more from the bath or tray edgeOn an existing circuit: no
Light switchOutside the zones, or a ceiling pull cord to keep wet hands off itOutside the zones: no
Electric showerOver the bath or tray, on its own circuit, fitted by a registered electricianNew circuit: yes. Straight swap: no
Electric underfloor heatingUnder the bathroom floorNear the bath or shower: yes

In England the line falls at the edge of the zones. A new light point above the bath needs certifying, while the same point 1 m from the bath, on an existing circuit, does not. A like-for-like swap is never notifiable, but the new fitting still needs the right rating for its zone.

Can you have a plug socket in a bathroom?

Only where it can sit at least 2.5 m from the edge of the bath or shower tray, according to Electrical Safety First's bathroom guidance. In a small bathroom there may be no wall that far from the bath. A shaver supply unit can go closer, because it is either SELV, running at a safety extra-low voltage, or built to BS EN IEC 61558-2-5.

RCD protection in bathrooms

Every circuit in or passing through a bathroom or shower room has to be protected by an RCD, the device that cuts the power quickly in a fault. That includes a circuit that only crosses the bathroom on its way to another room. For a mains-voltage fitting in zone 1, it is a 30 mA RCD.

An older consumer unit may have no RCD at all, which can mean upgrading the consumer unit before any fitting goes up. A replacement consumer unit is notifiable work in its own right.

If you are not sure what the board protects, an EICR tests the whole installation, including the switchgear and the earthing, for £100 to £300. Book it before a refit, so a board problem shows up before the tiles go on.

Is bathroom electrical work notifiable?

In England, bathroom electrics come under Part P of the building regulations, which makes 3 kinds of work notifiable: a new circuit, a replacement consumer unit, and any addition or alteration to circuits in a special location. In a bathroom, the special location is the zones.

An electrician registered with a competent person scheme self-certifies the work, tells building control for you and gives you 2 documents: an Electrical Installation Certificate to BS 7671 at the end of the job, and a Building Regulations compliance certificate within 30 days. With an unregistered electrician, a registered third-party certifier is appointed before work starts, or building control is told before work begins and charges to inspect.

Can you do bathroom electrics yourself?

Swapping a bathroom light fitting like for like is not notifiable in England, but the work still has to meet BS 7671 and the fitting needs the right IP rating for its zone. Notifiable work done yourself means telling building control before you start and paying its charge. Electrical Safety First advises using a registered electrician for any installation work.

Bathroom electrics rules in Wales, Scotland and Northern Ireland

The zones are the same in all four nations, because they are part of BS 7671. What changes is how the work is signed off.

How bathroom electrical work is signed off in each UK nation
NationWhat needs notifying or approvalWho signs it off
EnglandNew circuits, a replacement consumer unit, changes inside the zonesRegistered electrician, third-party certifier or building control
WalesAny new point or circuit change anywhere in the bathroomRegistered electrician or building control
ScotlandNo Part P; minor work may need no warrant but must meet the building standardsThe council's building standards team
Northern IrelandNo Part P; separate building regulationsDistrict council building control

Wales

Wales draws the line wider than England. GOV.WALES exempts extra power or lighting points and changes to existing circuits except in a kitchen or bathroom, or outdoors. So in Cardiff or Swansea, a new light point 2 m from the bath, or a fused spur added in the bathroom, has to be notified or done by a registered installer. The compliance certificate follows within 30 days, as in England.

Scotland

Scotland issues building warrants rather than Part P certificates. Minor work such as a new bathroom might not need a warrant, but it must still meet the Scottish building standards. In Edinburgh, Glasgow or Aberdeen, ask the council's building standards team before the electrician starts.

Northern Ireland

Northern Ireland has its own building regulations, with building control run by the district councils. In Belfast, ask the council's building control team whether the bathroom electrics need an application before work starts.

What bathroom electrics cost

In a new bathroom, the electrics are a small line: £250 to £500 of electrician's labour in a full refit, against £1,800 to £4,000 for the whole room's labour.

Electric underfloor heating costs £60 to £85 per m² installed, and in England wiring it near the bath or shower makes it notifiable work. A quote for bathroom electrics should name each fitting, its IP rating and its position, and who certifies the work.

Common questions

What is zone 1 and zone 2 in a bathroom?

Zone 1 is the space directly above a bath or shower tray, up to 2.25 m from the floor, and zone 2 is the band 0.6 m out from zone 1 to the same height. Both need fittings rated at least IPX4, and a mains-voltage fitting in zone 1 also needs a 30 mA RCD.

What are the different bathroom zones in the UK?

The UK uses 3 bathroom zones, 0, 1 and 2, plus the area outside them. Zone 0 is inside the bath or tray, zone 1 is above it to 2.25 m, and zone 2 extends 0.6 m beyond zone 1, all measured from the bath or tray.

What is zone 0 in a bathroom?

Zone 0 is the inside of the bath or shower tray, where water collects. Anything fitted there must be rated at least IPX7 for temporary immersion and run at 12 V or less, which limits it to sealed low-voltage lighting.

What is IP44 zone 2?

IP44 is the minimum rating for a fitting in bathroom zone 2, and the second 4 means it resists water splashed from any direction. Zone 1 has the same minimum, and a fitting that may meet cleaning jets needs IPX5 or higher.

Can you have a plug socket in a bathroom in the UK?

A standard socket is allowed only if it sits at least 2.5 m from the edge of the bath or shower tray. A shaver supply unit can go closer if it is SELV or built to BS EN IEC 61558-2-5. The circuit must be RCD-protected either way.

Does bathroom electrical work need to be certified?

In England, a new circuit, a replacement consumer unit or any wiring change inside the bathroom zones is notifiable under Part P. A registered electrician self-certifies it, and the compliance certificate follows within 30 days. In Wales, a new point anywhere in the bathroom is notifiable.

Where can an extractor fan go in a bathroom?

An extractor fan can go in zone 1, zone 2 or outside the zones, as long as it is rated at least IPX4 inside a zone. Most are fitted outside the zones, and fitting one costs £60 to £300.

Read next