Building regulations explained for homeowners

Which jobs are notifiable, how the application routes work, what building control inspects, and what a completion certificate is worth when you come to sell.

Building regulations are the minimum standards for how work on a home is built: structure, fire safety, insulation, drainage, ventilation and electrics. In England extensions, loft conversions, replacement windows, new boilers and rewires all need approval, and as the owner you are ultimately responsible for compliance, even when a builder applies. We cover which jobs need it, the ways to apply, who signs it off, the certificate you need to sell, and how Scotland, Wales and Northern Ireland differ.

What building regulations cover

In England the rules are the Building Regulations 2010, a set of minimum standards for how building work is designed and built. They cover structure, fire protection, access, energy performance, sound insulation, protection from falls, drainage, ventilation, damp, ground gases such as radon, and electrical and gas safety.

They deal with how the work performs, not how it looks, and the same standards apply whether a builder does the job or you do it yourself. The regulations themselves are short: a few lines of legal requirement per topic. The detail, such as how well a new wall must be insulated or how steep a loft stair can be, is set out in the Approved Documents, the government's guidance on meeting each part.

Building regulations or planning permission: what is the difference

Planning permission decides whether you can build something at all: its size, its appearance and its effect on neighbours and the street. Building regulations decide whether it is built safely and to standard. A project can need one, both or neither, and knowing whether you need planning permission tells you nothing about the building regulations answer.

A rear extension built under permitted development skips the planning application but still needs building regulations approval. So does every loft conversion, including a dormer that fits the size limits and needs no planning permission for a loft conversion.

Neither regime covers your neighbour's side of a shared wall. Work on or near one has its own notice procedure under the Party Wall Act, and building control approval does not replace it.

Which jobs need building regulations approval

The list runs well past extensions. The government's approval guide names replacement windows and doors, new roof coverings, fixed air conditioning, heating systems and even extra radiators alongside the obvious building work.

Common home projects in England and whether they need approval
ProjectApproval needed?Who usually handles it
Single or two-storey extensionYesFull plans application
Loft conversionYesFull plans application
Removing a load-bearing wall or chimney breastYesFull plans or building notice, with a structural engineer's calculations
Garage converted to a roomYesFull plans or building notice
Replacement windows and doorsYesInstaller registered with a competent person scheme
New or replacement boiler, extra radiatorsYesRegistered heating engineer, who self-certifies
New fuse box, or electrics near a bath or showerYesRegistered electrician, who self-certifies
New sockets or lights elsewhere in the houseNoAny competent electrician
New bathroom involving plumbingYesBuilding notice, unless each trade self-certifies
Replacing a bath, toilet, basin or sinkNoAny plumber
New covering on a pitched or flat roofYesBuilding notice, or a roofer registered with a competent person scheme
Fixed air conditioningYesRegistered installer, or a building notice

Electrics are where the list catches people out. A new socket in the living room is exempt, but any change to the wiring inside the bathroom electrical zones around a bath or shower is notifiable, and so is a new fuse box.

A garage looks like an easy win because the walls and roof already exist. But a garage conversion turns a store into a habitable room, so the new wall where the door was, the insulated floor and walls, the ventilation and the fire safety all need approval.

What you can build without building regulations approval

Exempt work still has to be done properly, but nobody has to approve it first. The exemptions in England cover:

  • Most repairs, replacements and maintenance, except work on heating systems, oil tanks, fuse boxes and glazing units
  • New power and lighting points, and changes to existing circuits, anywhere except around baths and showers
  • Replacing baths, toilets, basins and sinks
  • Insulation laid in a loft or under a timber floor
  • Some hot water storage systems holding less than 15 litres
  • Gutters and downpipes
  • External doors where less than half the door is glazed
  • Emergency repairs to a boiler or heating system, which need no advance approval but still follow the rules

Garden rooms, sheds and outbuildings

A detached building of up to 15 square metres with no sleeping accommodation is exempt. A single-storey detached building of up to 30 square metres is exempt too, provided nobody sleeps in it and it either sits at least 1 metre from every boundary or is built mostly from non-combustible materials. That covers most sheds, summerhouses, home offices and garden rooms. Add a bedroom, or go over 30 square metres, and the building needs approval like any other.

Porches and conservatories

A porch or conservatory added at ground level with a floor area of up to 30 square metres is exempt, provided its glazing meets the safety glazing rules, it is separated from the house by external-quality walls, doors or windows, and the home's heating system is not extended into it.

Take out the doors between the house and the conservatory, or run a radiator into it, and the exemption goes: it becomes an extension, with the insulation and glazing standards that come with one. None of this settles whether a conservatory needs planning permission, which turns on its size and position on the house.

Full plans, building notice or regularisation

In England you apply before work starts in one of two ways. A third route exists for work that has already been done.

The three building regulations routes in England
RouteSuitsPlans checked first?TimingWhat you end up with
Full plansExtensions, loft conversions, structural workYesDecision within 5 weeks, or 2 months with your consentApproved plans, then a completion certificate, usually within 8 weeks of finishing
Building noticeSmaller projects onlyNoWork can start 2 days after the notice is submittedNo formal approval; a completion certificate once the work passes inspection
RegularisationWork already done without approvalChecked after the eventCouncil only, for work carried out after 11 November 1985A regularisation certificate, if the work complies

Full plans costs time at the start and buys certainty, because the drawings are checked before anyone digs. A building notice suits a small, simple job such as a new bathroom. Nobody checks a design first, so if the inspector finds an undersized beam or a badly laid drain on site, the fix happens mid-build and the cost lands on the job.

Council building control or a registered building control approver

For most homes you choose who checks the work: your council's building control team or a private registered building control approver, the newer name for what used to be called an approved inspector.

Council building control and registered approvers compared
QuestionCouncil building controlRegistered building control approver
How you applyDirect to the council or through the Planning PortalDirect to the approver, who sends the council an initial notice
How the fee is setBased on the council's costsNegotiated with you
Retrospective approvalYes, through regularisationNo
Sign-off documentCompletion certificateFinal certificate

There is no national fee. Each council publishes its own charges, which depend on the type of work, the number of site inspections, the number of homes and the total floor area, so compare the council's figure with one or two approver quotes for the same drawings. Work carried out solely for a person with a disability may carry no fee.

Blocks of flats at least 18 metres or 7 storeys high with 2 or more homes are higher-risk buildings. Work there needs approval from the Building Safety Regulator before it starts, unless it is exempt, done under a competent person scheme or an emergency repair.

Competent person schemes: self-certified work

An installer registered with a competent person scheme can self-certify that the work complies, so you make no application at all. The installer tells the council on your behalf where needed, and you get a certificate within 8 weeks of completion. The certificate shows up in solicitors' searches when you sell, and the schemes carry insurance-backed warranties and complaints procedures.

Windows, boilers and electrics are the usual cases. By law, gas work has to be done by a Gas Safe registered engineer, and the notification for a new boiler comes through that registration. That certificate is a different document from the annual gas safety certificate a landlord needs for appliances already installed.

Electrical paperwork gets mixed up the same way. New wiring comes with an electrical installation certificate plus the scheme's building regulations certificate, while an EICR reports on the condition of wiring that already exists and signs nothing off.

The Approved Documents, part by part

The Approved Documents are the government's guidance on meeting each part of the regulations in England. Following them is the usual way to show compliance; a designer can meet a requirement another way, but then has to prove it to building control.

Approved Documents in England and where a home project meets them
PartCoversWhere a home project meets it
AStructureBeams, foundations, removing walls
BFire safetyEscape from a loft conversion, fire doors, smoke alarms
CSite preparation and resistance to contaminants and moistureDamp-proof courses, radon protection
DToxic substancesCavity wall insulation
EResistance to the passage of soundWalls and floors in conversions to flats
FVentilationExtractor fans in kitchens and bathrooms
GSanitation, hot water safety and water efficiencyBathrooms, unvented hot water cylinders
HDrainage and waste disposalNew drains, building near a sewer
JCombustion appliances and fuel storage systemsWood burners, flues, oil tanks
KProtection from falling, collision and impactLoft stairs and balustrades, including the stair regulations on pitch and headroom
LConservation of fuel and powerInsulation, windows, boilers and heating controls
M, O, Q, R, SAccess, overheating, security, broadband and electric vehicle chargingMainly new homes
PElectrical safetyNotifiable electrical work in a home
Regulation 7Materials and workmanshipEvery job

Inspections and the completion certificate

Building control inspects at key stages rather than watching the whole job. On an extension that usually means the foundation trench before the concrete goes in, the damp-proof course, drains before they are covered, the structure before it is boarded and a final visit. The builder normally books each one, so build them into the order of works before the programme is fixed.

When the final inspection passes, the council issues a completion certificate, usually within 8 weeks of the work finishing on a full plans application. A registered approver issues a final certificate instead. Either way, keep it: it is the document a buyer's solicitor asks for.

Work done without building regulations approval

The person who did the work can be prosecuted and fined, and the council can make you pay to put faulty work right.

The route back is regularisation: a retrospective application to the council, since a registered approver cannot take one on. It only covers work carried out after 11 November 1985. Expect the inspector to ask for finished work to be opened up, such as a trial hole beside a foundation or plasterboard taken off a wall, so budget for the digging and making good as well as the fee.

Building regulations in Scotland, Wales and Northern Ireland

Everything above is the England system. Wales, Scotland and Northern Ireland each set their own technical standards, so a project in Cardiff, Edinburgh or Belfast follows its own nation's rules.

Building regulations across the four UK nations
NationRules and guidanceWho approvesBefore work starts
EnglandBuilding Regulations 2010, Approved DocumentsCouncil, registered building control approver, or the Building Safety Regulator for higher-risk blocksFull plans, building notice or a competent person scheme
WalesWelsh building regulations, Approved Documents for WalesCouncil or a registered building control approver in WalesFull plans, building notice or a competent person scheme
ScotlandBuilding standards, Technical HandbooksThe council, acting as verifierA building warrant, then a completion certificate the council accepts at the end
Northern IrelandBuilding Regulations (Northern Ireland), Technical BookletsDistrict council building controlApproval from council building control

Scotland runs a building warrant system. You need the warrant from the council before work starts, and when the job is done you submit a completion certificate, which the council has to accept. Some smaller work needs no warrant but still has to meet the standards, and the Scottish Government's building standards guidance lists which.

Wales writes its own Approved Documents, so energy and fire requirements can differ from England even where the process looks the same. Registered building control approvers work in Wales too, on a separate Welsh register.

Northern Ireland keeps building control with its district councils, and its technical guidance comes as Technical Booklets rather than Approved Documents.

Common questions

Can I apply for building regulations approval myself?

Yes, a homeowner can submit a full plans application or a building notice to the council, including online through the Planning Portal, or appoint a registered building control approver directly. Builders and architects often apply for you, but as the owner you remain ultimately responsible for compliance, so agree in writing who is applying.

What can I build without building regulations?

You can do most repairs, replace baths, toilets and basins, add sockets away from baths and showers, lay loft insulation and replace gutters without approval. Detached outbuildings up to 15 square metres with no sleeping accommodation are exempt, as are ground-level porches and conservatories up to 30 square metres that are separated from the house and not heated by its system.

What are the current building regulations in the UK?

In England the current rules are the Building Regulations 2010, as amended, with the technical detail in the Approved Documents. Wales has its own regulations and Approved Documents, Scotland runs building warrants against its Technical Handbooks, and Northern Ireland has its own regulations with Technical Booklets.

What are the key changes to building regulations in 2026?

From 1 October 2026, applications for building control approval and initial notices for certain residential buildings may be charged the Building Safety Levy. It is a tax on top of the building control fee, so ask your council or approver whether your project is in scope before you apply.

What is a building regulations certificate?

A building regulations certificate is the document proving work met the regulations: a completion certificate from the council, a final certificate from a registered approver, or a certificate from an installer's competent person scheme. Scheme certificates arrive within 8 weeks of completion, and the completion certificate on a full plans application usually follows within 8 weeks of the work finishing.

How long does building regulations approval take?

A full plans application gets a decision within 5 weeks, or within 2 months if you agree to more time. A building notice needs no decision, so work can start 2 days after it is submitted. Regularisation takes longer, because finished work may have to be opened up for inspection.

Do replacement windows need building regulations approval?

Yes, replacing windows and doors needs building regulations approval in England, but a fitter registered with a competent person scheme self-certifies the work, so you make no application. The certificate should arrive within 8 weeks of completion. External doors where less than half the door is glazed are exempt.

What is building control?

Building control is the service that checks building work against the building regulations and signs it off. In England it comes from your council's building control team or a private registered building control approver, and for tall blocks of flats from the Building Safety Regulator. It checks plans, inspects at key stages and issues the completion or final certificate.