List your firm
Cost guides

How much does a resin driveway cost in 2026?

2026 prices per m² and by driveway size, what the base adds, resin bound against resin bonded, London rates, and when a front drive needs planning permission.

A resin bound driveway costs £60 to £120 per m² fitted in the UK in 2026, so a two-car drive of about 40 m² lands between £3,000 and £7,500. Where a quote falls depends mostly on the base under the resin. We give prices per m² and by size, what an overlay saves against a dig-out, resin bound against resin bonded, London prices and the planning rule in each UK nation.

Resin driveway cost per m² in 2026

Resin bound surfacing costs £60 to £120 per m² fitted across the UK in 2026. That covers the resin, the stone and the labour to lay it. The biggest swing inside the range is the base: whether the resin goes over the old drive, or the old drive comes up first.

Resin bound driveway prices per m², UK, 2026
JobPrice per m²What the price assumes
Resin bound, fitted£60 – £120UK range, all base types
Overlay on the existing drive£60 – £85Sound tarmac or concrete left in place
Full dig-out and new sub-base£85 – £130Old surface removed, new base laid
Resin and stone only£30 – £50Materials, no labour or base work

Resin and stone cost £30 to £50 per m². The rest of a fitted price is labour, the base, the edging and removing whatever was there before.

Resin driveway cost by size

These are 2026 totals for a resin bound drive with UV-stable resin, aggregate, edging and waste removal included. The overlay column assumes a sound existing base. The dig-out column includes lifting the old drive and laying a new sub-base.

Resin bound driveway totals by size, UK, 2026
DrivewayAreaOverlayFull dig-out
Small, one carAbout 20 m²£1,400 – £2,000£2,000 – £3,000
Average, two carsAbout 40 m²£3,000 – £5,000£4,500 – £7,500
Large, three cars60 m² or more£4,200 – £6,500£6,500 – £10,500

Past the three-car row, a drive of 100 m² or more that needs a new base can pass £10,000.

Overlay or dig-out: what the base adds

An overlay lays resin straight onto the existing drive. It works when the tarmac or concrete underneath is structurally sound, with no cracks running through it and no sinking. It costs £60 to £85 per m².

A dig-out takes the old surface away, lays a new sub-base and puts the resin on that. It costs £85 to £130 per m², and the base work alone moves a quote by £25 to £50 per m². On a 40 m² drive, the gap between the two routes is £1,500 to £2,500.

Every quote should say which route it prices and why. An overlay proposed without anyone walking the drive and checking the base is a guess at the job.

What pushes a resin driveway quote up

When two quotes for the same drive differ, the gap usually comes from one of these:

  • The base. A dig-out and new sub-base is the largest single extra, and the reason the same drive can be quoted anywhere from £60 to £130 per m².
  • Size. Small drives cost more per m². A one-car drive typically runs £80 to £120 per m², a larger drive for several cars £60 to £90, and some installers set a minimum charge below 20 m².
  • Resin grade. UV-stable resin costs slightly more. Resin that is not UV-stable can yellow within a couple of years.
  • Edging. A new edge to hold the resin costs £20 to £45 per linear metre, so a long frontage or a curved path adds up.
  • Removing the old surface. Dug-out tarmac, concrete or paving has to go somewhere, and skip hire starts from £160 when waste removal is not already in the price.
  • Drainage. Where the ground holds water, a soakaway or drainage run is added after the survey.
  • Location. Rates run higher in towns and cities than in rural areas, and highest in London.
  • Design. A border in a second colour, or a pattern, takes longer to lay than one blend across the whole drive.

Resin bound or resin bonded

The two names sound alike and are different products. Resin bound mixes the stone into the resin before it is trowelled flat, so water drains through the gaps between the stones. Resin bonded spreads resin over a solid base and scatters loose stone on top, and water runs off it.

Resin bound against resin bonded
PointResin boundResin bonded
How it is laidStone mixed into the resin, then trowelled flatResin spread on a solid base, loose stone scattered on top
RainwaterDrains through the surfaceRuns off the surface
Front drive over 5 m², EnglandNo planning applicationPermission, unless water drains to a lawn or border
Price£60 – £120 per m² fittedSold as the cheap option

Because resin bonded is not permeable, the choice matters most on a front drive, where a sealed surface can need planning permission and resin bound would not.

For a driveway, resin bound is laid 15 to 18 mm deep, and at least three times the size of the largest stone in the mix. A quote at 10 to 12 mm is too thin for cars.

Resin against tarmac, block paving and gravel

Per square metre, resin sits between tarmac and block paving, and across the UK it costs about the same as block paving. In London resin undercuts block paving.

Driveway surfaces per m² fitted, 2026
SurfaceUKLondon
Resin bound£60 – £120£75 – £130
Block paving£70 – £120+£90 – £150
Tarmac£45 – £65£60 – £95
Gravel£25 – £45£35 – £60

Tarmac is the cheapest sealed surface, and tarmac driveway prices start at £45 per m² against £60 for resin. Concrete runs £55 to £80 per m². Gravel is the cheapest of all at £25 to £45 per m², and it stays loose underfoot.

Resin driveway costs in London and by region

A resin drive in London costs £75 to £130 per m² in 2026, against £60 to £120 across the UK. Labour is most of the difference: a trained crew in London costs £350 to £550 a day.

Outside London, a quote near the top of the UK range is normal in a big city and worth a second opinion in a market town, where installers run on lower costs.

Do you need planning permission for a resin driveway?

In England, a front drive of any size needs no planning permission if its surface is permeable or the rainwater runs to a lawn or border, under the Planning Portal's front garden rules. Over 5 m², a surface that is not permeable and drains nowhere needs permission.

Resin bound is permeable, so it passes. Resin bonded is not, so a bonded front drive over 5 m² needs either a drain to a lawn or border or a planning application. These rules are part of the permitted development rights that houses have, and they do not apply to flats and maisonettes, some converted houses, or homes where an Article 4 direction or a planning condition removes them.

Front drive planning outcome by nation
NationWhere the rule appliesResin boundResin bonded, no drainage
EnglandFront garden, over 5 m²No applicationPlanning permission
WalesAny new or replacement surface at the frontNo applicationPlanning permission, except repairs up to 5 m²
ScotlandBetween the house and a road, any sizeNo applicationPlanning permission
Northern IrelandBetween the front of the house and a road, over 5 m²No applicationPlanning permission

Wales is stricter at the front. Under Welsh Government guidance, any new or replacement hard surface there has to be permeable or drain to a permeable surface, and only repairs to existing surfacing of up to 5 m² are exempt.

Scotland sets no size threshold. Class 3C of the Scottish Government's Circular 1/2024 says a hard surface between the house and a road must be porous or drain to a porous area, and a drive in a conservation area or at a listed building needs planning permission.

Northern Ireland follows the England pattern. Under Class E of the Planning (General Permitted Development) Order (Northern Ireland) 2015, a hard surface over 5 m² between the front of the house and a road must be porous or permeable, or drain to an area that is.

Planning covers the surface, not the pavement. Driving across a pavement onto the property needs a dropped kerb, a separate job at £600 to £1,500.

How long a resin driveway takes and lasts

On a prepared base, laying resin takes one to two days. Jobs run 1 to 4 days across all sizes and stone grades, and a dig-out adds the time to lift the old drive and build the new base.

When the drive is part of a bigger project, price it with the rest of a renovation budget but book it last, once skips and delivery lorries no longer need to cross it.

A resin bound drive lasts 15 to 25 years. The top of that range needs UV-stable resin on a sound base. Upkeep is a regular sweep and an occasional power wash.

Is a resin driveway worth it?

Resin earns its price in some homes and not in others. It is a good fit for:

  • A front drive: resin bound is permeable, so it meets the front-garden drainage rule in all four UK nations without a drain to a lawn or border.
  • Low upkeep: a sweep and an occasional power wash, over a life of 15 to 25 years.
  • A sound existing drive: an overlay at £60 to £85 per m² puts a new surface down without the cost of a new base.
  • London: at £75 to £130 per m², resin costs less than block paving at £90 to £150.

It is the wrong choice when:

  • The budget is tight. Tarmac starts at £45 per m² and gravel at £25.
  • The old drive is cracked or sinking and the budget will not stretch to a dig-out, because an overlay brings the faults straight back.

Common questions

How much does a resin driveway cost per m²?

A resin bound driveway costs £60 to £120 per m² fitted in the UK in 2026. Laying over a sound existing drive costs £60 to £85 per m², and a full dig-out with a new sub-base costs £85 to £130. In London the range is £75 to £130 per m².

How much is a resin driveway for 2 cars?

A two-car resin drive of about 40 m² costs £3,000 to £5,000 as an overlay and £4,500 to £7,500 with a full dig-out in 2026. Those totals include edging and waste removal. A dropped kerb, if you need one, adds £600 to £1,500.

Is a resin driveway cheaper than block paving?

A resin driveway costs about the same as block paving across the UK, at £60 to £120 per m² against £70 to £120. In London resin is the cheaper of the two, at £75 to £130 per m² against £90 to £150. Tarmac and gravel cost less than both.

What are the downsides of resin driveways?

The main downsides are the price against tarmac or gravel, and how much the result depends on the installer. Resin that is not UV-stable can yellow within a couple of years, a weak base cracks through the surface, and a mix laid at 10 to 12 mm is too thin. Resin bonded, the cheaper scatter system, is not permeable.

Are resin driveways worth it?

A resin bound drive is worth it when you want a permeable, low-upkeep surface that lasts 15 to 25 years. It costs more than tarmac, at £60 to £120 per m² against £45 to £65, so on a tight budget tarmac or gravel does the job for less. It is not worth laying over a cracked base.

Can you power wash a resin driveway?

Yes, an occasional power wash is part of the normal upkeep of a resin driveway, with a regular sweep in between. A drive laid with UV-stable resin on a sound base needs little else over a life of 15 to 25 years.

Do you need planning permission for a resin driveway?

A resin bound driveway needs no planning permission in England, because it is permeable and water drains through it. A resin bonded surface is not permeable, so a bonded front drive over 5 m² needs permission unless the water runs to a lawn or border. Flats, maisonettes and homes under an Article 4 direction fall outside these rules.

How long does a resin driveway last?

A resin bound driveway lasts 15 to 25 years. Reaching the top of that range takes UV-stable resin, a sound base and a mix laid 15 to 18 mm deep. Resin that is not UV-stable can yellow within a couple of years.

Can resin be laid over an existing driveway?

Resin can be laid over an existing tarmac or concrete drive if the base is structurally sound. An overlay costs £60 to £85 per m², against £85 to £130 for a dig-out. Over a cracked or sinking base the faults come back through the resin, so the old drive has to come up first.

How long does it take to lay a resin driveway?

Laying a resin driveway takes one to two days on a prepared base. Larger drives and dig-outs take longer, and jobs run 1 to 4 days depending on the size of the drive and the stone used.

Read next